Floor loading min. 50kN/m2
Standard dock levellers
Level access doors
Secure gated and fenced yard
Roof lights min. 10%
Ability to install sprinkler tank
Available Now
New Logistics and Advanced Manufacturing buildings.
Extending to a total of 69 acres, Symmetry Park Bicester has already delivered 692,800 sq ft of prime logistics space across its earlier phases, with Phase 3 set to add a further 270,000 sq ft.
Phase 3 benefits from detailed planning consent for up to 270,000 sq ft of logistics floor space, across 2-units of 115,000 and 155,000 sq ft. For more information, download the park plan below. The units will be ready for occupation from Q3 2026.
Phase 2: Unit D (60,000 sq ft) has been let to DPD Group UK Ltd.
Phase 1: Unit A1 (88,000 sq ft) was pre-sold to Bentley Designs Ltd with Unit A2 (110,000 sq ft) developed speculatively and subsequently sold to Medline Services Ltd. Unit B (163,664 sq ft) was developed speculatively and let to Ocado Retail Ltd. Unit C (271,227 sq ft) was developed speculatively and let to Syncreon Technology UK Ltd (DP World Logistics).
Max Bowen
Development Surveyor, Tritax Big Box Developments
Max.Bowen@tritaxbigboxdev.co.uk (0)1604 330669
| Status | Camera | Warehouse | Office | Total | ||||
|---|---|---|---|---|---|---|---|---|
| SQ FT | SQ M | SQ FT | SQ M | SQ FT | SQ M | |||
| UNIT 06 | DETAILED PLANNING GRANTED | 147,680 | 13,720 | 8,008 | 744 | 155,688 | 14,464 | |
| UNIT 07 | DETAILED PLANNING GRANTED | 109,382 | 5,930 | 10,162 | 551 | 115,312 | 10,713 | |
UNIT 06
DETAILED PLANNING GRANTED
| SQ FT | SQ M | |
|---|---|---|
| Warehouse | 147,680 | 13,720 |
| Office | 8,008 | 744 |
| Total | 155,688 | 14,464 |
UNIT 07
DETAILED PLANNING GRANTED
| SQ FT | SQ M | |
|---|---|---|
| Warehouse | 109,382 | 5,930 |
| Office | 10,162 | 551 |
| Total | 115,312 | 10,713 |
what3words: ///plotter.stripped.manliness
Postcode: OX26 6GF
Floor loading min. 50kN/m2
Standard dock levellers
Level access doors
Secure gated and fenced yard
Roof lights min. 10%
Ability to install sprinkler tank