Floor loading min. 50kN/m2
Standard dock levellers
Level access doors
Secure gated and fenced yard
Roof lights min. 10%
Ability to install sprinkler tank
Available Now
Symmetry Park Kettering extends to a total of 136 acres and benefits from outline planning permission for 2.3 million sq ft of logistics space.
Located directly alongside the A14 "Trans-European" freight route at Junction 9, it offers excellent connectivity to the UK motorway and trunk road network.
Greggs PLC National Distribution Centre (Unit 04)
Unit 04 completed in September 2025 and was pre-committed to Greggs. Phase 1 of 311,000 sq ft was developed by Tritax Big Box Developments, with planning permission also granted for an additional 100,000 sq ft of expansion space. This building will meet BREEAM ‘Excellent’ certification, be Net Zero Carbon in Construction, and holds an EPC 'A' rating.
956,000 sq ft Pre-Let Facility (Unit 03)
A major pre-let client has secured this expansive building, now under construction and set for completion in Q3 2026. It will meet BREEAM ‘Excellent’ certification, be Net Zero Carbon in Construction, and hold an EPC 'A' rating.
Iron Mountain (Unit 02)
Unit 02 was pre-let to Iron Mountain and successfully completed in February 2023.
Jonathan Wallis
Managing Director, Tritax Big Box Developments
Jonathan.Wallis@tritaxbigboxdev.co.uk (0)1604 330651
Charlie Mackaness
Associate Development Director, Tritax Big Box Developments
Charlie.Mackaness@tritaxbigboxdev.co.uk (0)1604 330664
Grace Hopkins
Graduate Development Surveyor, Tritax Big Box Developments
Grace.Hopkins@tritaxbigboxdev.co.uk (0)1604 330684Select a camera icon to view timelapse camera
what3words: ///calculate.along.buildings
Postcode: NN14 1HQ
Floor loading min. 50kN/m2
Standard dock levellers
Level access doors
Secure gated and fenced yard
Roof lights min. 10%
Ability to install sprinkler tank