Available Now

1M SQ FT UNDER CONSTRUCTION

Symmetry Park Kettering extends to a total of 136 acres and benefits from outline planning permission for 2.3 million sq ft of logistics space. 

Located directly alongside the A14 "Trans-European" freight route at Junction 9, it offers excellent connectivity to the UK motorway and trunk road network.

Greggs PLC National Distribution Centre (Unit 04)
Unit 04 completed in September 2025 and was pre-committed to Greggs. Phase 1 of 311,000 sq ft was developed by Tritax Big Box Developments, with planning permission also granted for an additional 100,000 sq ft of expansion space. This building will meet BREEAM ‘Excellent’ certification, be Net Zero Carbon in Construction, and holds an EPC 'A' rating.

956,000 sq ft Pre-Let Facility (Unit 03)
A major pre-let client has secured this expansive building, now under construction and set for completion in Q3 2026. It will meet BREEAM ‘Excellent’ certification, be Net Zero Carbon in Construction, and hold an EPC 'A' rating.

Iron Mountain (Unit 02)
Unit 02 was pre-let to Iron Mountain and successfully completed in February 2023.

 

TIMELAPSE CAMERA - UNIT 04

TIMELAPSE CAMERA - UNIT 03

For more details or to arrange a site viewing please contact:

Jonathan Wallis

Jonathan Wallis

Managing Director, Tritax Big Box Developments

Jonathan.Wallis@tritaxbigboxdev.co.uk (0)1604 330651
Charlie Mackaness

Charlie Mackaness

Associate Development Director, Tritax Big Box Developments

Charlie.Mackaness@tritaxbigboxdev.co.uk (0)1604 330664
Grace Hopkins

Grace Hopkins

Graduate Development Surveyor, Tritax Big Box Developments

Grace.Hopkins@tritaxbigboxdev.co.uk (0)1604 330684

Select a camera icon to view timelapse camera

Location

what3words: ///calculate.along.buildings

Postcode: NN14 1HQ

Kettering Location map

Travel times

Floor loading min. 50kN/m2

Standard dock levellers

Level access doors

Secure gated and fenced yard

Roof lights min. 10%

Ability to install sprinkler tank

Other Spaces