Floor loading min. 50kN/m2
Standard dock levellers
Level access doors
Secure gated and fenced yard
Roof lights min. 10%
Ability to install sprinkler tank
Available Now
Symmetry Park Kettering extends to a total of 136 acres and benefits from outline planning permission for 2.3 million sq ft of logistics space.
Located directly alongside the A14 "Trans-European" freight route at Junction 9, it offers excellent connectivity to the UK motorway and trunk road network.
A planning application has been submitted for a new 311,000 sq ft National Distribution Centre for Greggs PLC, with completion set for Q4 2025. The building will meet BREEAM ‘Very Good’ standards, be Net Zero Carbon in Construction, and hold an EPC 'A' rating.
The Site also features Unit 02, newly occupied by Iron Mountain, and a 76-acre development plateau capable of accommodating buildings up to 1.3 million sq ft. Reserved Matters Consent has been secured for a 123,000 sq ft building, deliverable within 12 months of terms being agreed. Design and Build solutions are available for occupation during 2025.
Jonathan Wallis
Director | Head of Northampton Office, Tritax Big Box Developments
Jonathan.Wallis@tritaxbigboxdev.co.uk (0)1604 330651Charlie Mackaness
Associate Development Director, Tritax Big Box Developments
Charlie.Mackaness@tritaxbigboxdev.co.uk (0)1604 330664M1 / M6 Interchange
23miles
26mins
Northampton
18miles
27mins
Leicester
41miles
45mins
Birmingham
58miles
1hr
Nottingham
67miles
1hr 10mins
London
82miles
1hr 50mins
Manchester
140miles
2hrs 20mins
Floor loading min. 50kN/m2
Standard dock levellers
Level access doors
Secure gated and fenced yard
Roof lights min. 10%
Ability to install sprinkler tank
Land Opportunities
The Site extends to a total of 134 acres gross and has the capacity to deliver up to 1.4m sq ft of logistics floor space
Land Opportunities
221-acre site acquired for c.2.5 million sq ft logistics development and new strategic rail freight interchange (SRFI).
Land Opportunities