1.6M SQ FT FULLY OCCUPIED
Symmetry Park Kettering extends to a total of 136 acres and is fully occupied.
Located directly alongside the A14 "Trans-European" freight route at Junction 9, it offers excellent connectivity to the UK motorway and trunk road network.
Iron Mountain (Unit 02)
Unit 02 was pre-let to Iron Mountain and successfully completed in February 2023.
956,000 sq ft Pre-Let Facility (Unit 03)
Amazon secured the building on a pre-let basis with completion occurring in September 2026. The building meets BREEAM ‘Excellent’ certification, Net Zero Carbon in Construction, and holds an EPC 'A' rating.
Greggs PLC National Distribution Centre (Unit 04)
Unit 04 completed in September 2025 and was pre-committed to Greggs. Phase 1 of 311,000 sq ft was developed by Tritax Big Box Developments, with planning permission also granted for an additional 100,000 sq ft of expansion space. This building will meet BREEAM ‘Excellent’ certification, be Net Zero Carbon in Construction, and holds an EPC 'A' rating.
